Requirements

To provide the client with a fully waterproof rooftop membrane system that can be left exposed & does not need to be covered with tiles, roofing sheets, timber decking etc.
This was the first time in Australia the SIKA “Sarnafil” sheet membrane system was to be installed on the composite plywood sandwich panel. In consultation with the builder, AWP & Sika we worked together to come up with the most suitable drainage & penetration details required to complete the Sarnafil membrane successfully.

Works Carried Out…

Waterproofing to the rooftop area (400m2 in total) with Sarnafil G410-15L sheet membrane system including all necessary glues, sealants, flashings required to complete the project.